Real projects, real results. Some of the most respected contractors in North America rely on Jobsite360 for temporary lighting and power. To date, they have saved over 900 million kilowatt hours.
From a heritage restoration on Parliament Hill to a 1.2 million square foot outlet centre, each summary covers the project, the challenge, what Lind delivered and one result. The full case studies are on jobsite360.net.
PCL Construction · Edmonton, AB
A mixed-use sports and entertainment district in downtown Edmonton, with the Stantec Tower, JW Marriott, Legends Private Residences, Central Parkade and Edmonton Tower.
Electricity costs for temporary lighting are often underestimated and not always accounted for. With traditional bulb-based lights, the electricity on this project would have cost $3,577,313.
Lind worked with PCL to adopt the Jobsite360 temporary lighting system across all phases of construction, from the first lights on the Edmonton Tower in the spring of 2015, and tracked energy use throughout the project.
TWZ Group · Ottawa, ON
The rehabilitation of the Centre Block on Parliament Hill, the home of Canada’s Parliament, modernizes the century-old building while preserving its heritage.
The protection of the building’s many heritage components is a critical concern for the construction team, on a restoration of this complexity and scale.
Jobsite360 lighting throughout the project, adopted by TWZ Group, the electrical contractor for temporary lighting. A modular daisy-chain replaced traditional stringlights: fewer lights, installation points and circuits, while lighting more space.
Clark Builders · Edmonton, AB
The newest facility of the Northern Alberta Institute of Technology: about 17,650 square metres (190,000 square feet), opened in September 2018.
Traditional temporary lights waste energy, need expensive labour to replace broken and burnt-out bulbs, and are slow to restart after a power disruption, which causes downtime.
Clark Builders partnered with Vallen to adopt the Jobsite360 lighting system. Lind’s Jobsite360 specialists reviewed the floorplans and provided a temporary lighting layout with a full savings analysis and bill of materials.
Ledcor Group · Tsawwassen, BC
A 1.2 million square foot premium outlet shopping destination just outside Vancouver, built from 2014 to its opening in October 2016.
The site was outside electrical and sewer service areas. It ran on generators at the start, and the electrical supply was subject to disruptions.
Over 255 Beacon360 120W lights instead of 400W metal-halide high-bays, attached to the structural steel with the Jobsite360 magnet mount. Their instant start and restart kept crews working with limited downtime.
Tell us about your next build. Our team can review your drawings and plan the temporary lighting and power with you, from layout to delivery.